Asian Development Bank (ADB) Manila, Филиппины
2026
Информация
Early Market Engagement (EME) for the Dhaka Sewerage System Development Project is a market consultation event to gather feedback on the draft procurement strategy and proposed construction methodologies for trunk sewer mains and sewage treatment works. The project aims to develop a climate-resilient and integrated sewerage system in the Rayerbazar catchment to serve at least 900,000 people and construct sewer networks, property connections, trunk mains, pumping stations and a sewage treatment plant. The EME provides stakeholders an opportunity to influence performance standards and attract qualified contractors and suppliers for the project.
Преимущества
Opportunity to provide feedback on procurement strategy and construction methodologies; potential to attract and be considered for contracting opportunities on the project.
Требования к участникам
Contractors and suppliers.
Подача заявки
Registration: open to BOF participants.
Всегда проверяйте детали на официальном сайте перед подачей заявки. Нашли ошибку? Сообщите нам.